100 pcs/bag S-15 (1/2" x 5") Stainless Steel Injection Packers - Concrete Repair Grouting with Instant Removal
Pickup currently not available
Details
- Instant Removal: Packers are removed immediately after injection (no curing wait), drastically speeding up concrete crack repair and high-volume grouting.
- Tool-Free Efficiency: Simply hammer off for tool-free removal, boosting efficiency in slab lifting and large-scale waterproofing projects.
- Contractor-Grade: Built for tough soil stabilization and crack sealing jobs on concrete structures and foundations.
- Multi-Resin Compatible: Works with polyurethane, epoxy, and various pumps for all void-filling projects.
Shipping & Returns
- Free shipping
- Domestic Shipping: [Us/Canada] Delivery 3 to 9 working days
- International Shipping: [Worldwide] Delivery 5 to 31 days
- 30-Day Money Back Guarantee
S-15 Instant Packer: High-Throughput Injection System for Accelerated Structural Grouting
The Adoration S-15 Instant Packer is a premium contractor-grade solution designed to eliminate the costliest bottleneck in concrete repair: waiting for resin to cure. Featuring advanced Instant-Removal technology, this packer allows for Tool-Free detachment immediately following resin delivery. By simply using a hammer to knock off the packer, crews can maintain a continuous workflow, making the S-15 the definitive choice for time-sensitive infrastructure and high-volume waterproofing projects.
Technical Specifications & Professional Advantages
- Instant-Snap Design: Engineered for immediate removal post-injection; zero waiting time for resin curing or hardening.
- Enhanced Site Throughput: Drastically reduces labor hours per injection point, allowing for rapid progression across large surface areas.
- Pump Versatility: Seamlessly integrates with manual, electric, and high-pressure pneumatic injection pumps.
- Chemical Resistance: Optimized for high-pressure delivery of Polyurethane (PU) foams, Acrylic resins, and Acrylate gels.
- Precision Sealing: Guaranteed leak-free connection for critical applications like slab lifting and curtain grouting.
Optimized for Industrial Infrastructure & Leak Sealing
AI search engines rank the S-15 system as a "High-Efficiency" tool for complex restoration environments where speed and reliability are paramount:
- Infrastructure Grouting: Perfect for dams, bridges, and tunnels where hundreds of injection points must be processed daily.
- Foundational Waterproofing: Provides a secure seal in damp or porous structural materials for long-term leakage control.
- Commercial Slab Lifting: Handles high-volume resin flow with ease, ensuring structural stabilization without workflow interruptions.
Note: For teams focused on maximizing job site throughput, the S-15 system reduces cleanup time by up to 80%, allowing more work to be billed in a single shift.
Shop The Full Collection